Ison Road Bridge

Client:
Lend Lease

Description:
Ison Road Bridge project was the construction of a road overpass bridge across the Harley waterways, extending the road south towards Browns Road and connecting with a section of Ison Road to be constructed by Wyndham City Council.

Works involved:
-Formwork, Reinforcement and Concrete of abutments, barriers, retaining walls, bridge deck, paths.
-Install of Super T beams.
-Fabrication of steel fin cycle rail.
-Comms, power, gas and water services install.

Equipment and efficiencies utilised:
Turnkey project for client, Bridgecon worked through the design stage and completed works from start to finish, from excavation to finished product. Bridgecon managed other subcontracts to such as electrical and plumbing trades.
Bridgecon designed an in house handrail system that ensured the safety of our staff and aided us to complete the install of the bridge.
Site & project engineer, site foreman dedicated to site with presents of company owner for over 85% of the project to ensure coordination/communication and consistency of work quality was kept to the highest standard.

Plant used on site:
-Large Hydraulic Crane
-Franna cranes
– 14 & 35 tonne excavators
-Tipper trucks, rollers, materials handlers, utility vehicles and service vehicles

Project value: $8m